NHAI accepts IRB bid for Surat-Dahisar section
IRB Infrastructure Developers Limited has received an LOA from the National Highways Authority of India (NHAI) accepting the company’s Price Bid for the Surat – Dahisar BOT project.
NHAI has declared IRB Infrastructure Developers Limited as the “successful bidder” for the project involving the six-laning of the existing four-lane Surat – Dahisar section of NH 8 from k.m. 263 to k.m. 502 (an aggregate length of 239 k.m.
The Company is required to execute the concession agreement for the Project within 45 days.
Sourced From: Concept Public Relations India Pvt. Ltd
Tags: calls, daytrading, free calls, intraday, tips
Similar Posts:
Latest Query
- by Sam
Search Our Archives
Research Desk
- Stocks Trading above their 50 day moving average - DMA In Stock Research
- Download free Ebooks based on Technical Analysis In Personal Training
- TOP 100 Stocks with the Highest P/E as on July 14th, 2013 In Stock Research
- TOP 100 Stocks with the Lowest P/E as on July 14th, 2013 In Stock Research
- Charting Pathsala - Your guide to Techincals In Technical Analysis